CENTRE 67 %
GARE 45 %
KIRCHBERG 30 %
PARK AND RIDE 32 %
  • N12 Luxembourg to Belgique

    between cross-roads Luxembourg - Place de l'Etoile and t-junction Siweburen stationary traffic, multi-vehicle accident, lane blocked

  • A1 Croix de Gasperich to Frontière Allemagne

    between junction Kirchberg and junction Flaxweiler stationary traffic for 7 km, one lane blocked, multi-vehicle accident, clear a lane for emergency vehicles, local drivers are recommended to avoid the area

  • A7 Schieren to Jonction Grunewald

    between junction Colmar-Berg and junction Mierscherbierg set of roadworks during the night, closed, duration: March 23, 2017 08:00 pm until March 24, 2017 06:00 am, follow diversion signs, recommended diversion via N7 Roost

  • A1 Frontière Allemagne - Croix de Gasperich

    junction Mertert in both directions set of construction work, entry slip road closed, duration: March 23, 2017 08:00 pm until March 24, 2017 06:00 am, follow diversion signs, recommended diversion via A1 Potaschberg

  • CR169 Schifflange - Leudelange

    between roundabout Pontpierre and t-junction Leudelange in both directions set of construction work, closed ahead, traffic problem, duration: April 11, 2017 07:00 am until April 20, 2017 07:00 pm, follow diversion signs

  • CR184 France - Dudelange

    t-junction Dudelange - Route de Zoufftgen in both directions set of construction work, narrow lanes, duration: March 24, 2017 02:00 pm until 06:00 pm

  • CR184 Dudelange - France

    between t-junction Dudelange - Route de Zoufftgen and t-junction Route de Thionville in both directions set of construction work, narrow lanes, duration: March 25, 2017 06:00 am until 12:00 pm

  • N31 France - Livange

    cross-roads Dudelange in both directions set of construction work, narrow lanes, duration: March 27, 2017 08:00 am until March 31, 2017 05:00 pm

  • N5 France - Luxembourg

    between university Petange - Lycée LTMA and cross-roads Bomicht in both directions march, closed, duration: March 26, 2017 12:00 pm until 11:00 pm

  • N31 France - Livange

    roundabout Petange in both directions set of construction work, tunnel closed, duration: March 22, 2017 02:00 pm until 03:00 pm

  • CR106 Roodt-Lès-Ell - Lallange

    between cross-roads Limpach - Rue de Pissange and cross-roads Mondercange in both directions set of construction work, closed ahead, traffic problem, duration: March 23, 2017 until March 24, 2017, follow diversion signs

  • CR132

    between Gonderange and cross-roads CR129 (Eschweiler) in both directions set of construction work, closed ahead, traffic problem, duration: April 03, 2017 until May 19, 2017, follow diversion signs

  • N14 Wecker - Diekirch

    between t-junction Boudlerbach and cross-roads N14 / CR132 (Eschweiler-Brouch) in both directions set of construction work, closed, duration: April 24, 2017 08:00 am until April 27, 2017 05:00 pm

  • CR113

    between Hunnebour and Hollenfels in both directions closed ahead until March 24, 2017 06:00 am during the night, follow diversion signs

  • Remich

    Cavalcade in both directions march, closed ahead, duration: March 26, 2017 08:00 am until 08:00 pm

  • CR134

    between Ehnen and Gostingen in both directions set of construction work, closed, duration: March 29, 2017 08:00 am until May 05, 2017 05:00 pm

  • N5 Luxembourg to France

    between t-junction Helfent and roundabout Route du 9 Septembre set of construction work, lane closed, duration: March 22, 2017 09:00 am until March 24, 2017 05:00 pm

  • CR184 Dudelange to France

    between t-junction Dudelange - Route de Zoufftgen and t-junction Route de Thionville set of construction work, narrow lanes, duration: March 25, 2017 06:00 am until 12:00 pm

  • CR102 Mersch - Dippach

    between t-junction Mamer Centre and t-junction Dippach in both directions cycle race, closed, duration: April 02, 2017 08:00 am until 07:30 pm

  • UC Dippach Course

    Dippach-Holzem-Garnich-Dahlem cycle race, closed, duration: April 02, 2017 08:00 am until 07:30 pm

  • N5 France - Luxembourg

    between roundabout Rondpoint Dippach (N13/N5) and cross-roads Dippach in both directions cycle race, closed, duration: April 01, 2017 12:00 pm until April 02, 2017 07:30 pm during the day time

  • CR119 Route Nationale 11 - Schrondweiler

    cross-roads Ernzen in both directions set of temporary traffic lights, duration: March 13, 2017 08:00 am until April 13, 2017 05:00 pm

  • N13 Windhof to Bous

    between cross-roads Wickrange and roundabout Pontpierre set of construction work, closed ahead, traffic problem, duration: April 04, 2017 until April 21, 2017, follow diversion signs

  • N31 France - Livange

    cross-roads Esch/Burgoart in both directions set of construction work, closed ahead, traffic problem, duration: April 07, 2017 until April 21, 2017, follow diversion signs

  • N31 Livange - France

    between t-junction Bettembourg Ouest and junction A13 - Burange in both directions set of construction work, closed, duration: April 08, 2017 07:00 am until April 22, 2017 06:00 pm

  • Schifflange

    rue de la Libération in both directions set of construction work, lane closed, traffic problem, duration: March 20, 2017 until March 24, 2017 in the city centre, local drivers are recommended to avoid the area

  • CR134

    between Mertert and Manternach in both directions set of construction work, closed ahead, traffic problem, duration: March 30, 2017 08:00 am until 06:00 pm, follow signs

  • CR134

    between Manternach and Mertert in both directions set of construction work, set of temporary traffic lights, traffic problem, duration: March 27, 2017 until March 29, 2017

  • CR101 Altlinster - Belgique

    between intermediate points Autoroute du Nord and bridge Autoroute d'Arlon in both directions sports event meeting, closed, duration: July 16, 2017 08:00 am until 05:00 pm

  • Bridel

    rue des Pins in both directions set of construction work, closed, duration: April 05, 2017 08:00 am until 04:00 pm

  • CR122 Lorentzweiler - Wormeldange

    between cross-roads Bourglinster and cross-roads Gonderange in both directions set of construction work, closed, duration: April 10, 2017 08:00 am until April 12, 2017 05:00 pm

  • N31 Livange - France

    between t-junction Bettembourg Ouest and junction A13 - Burange in both directions set of construction work, set of temporary traffic lights, duration: March 06, 2017 01:58 pm until July 28, 2017 08:00 pm

  • CR364 Echternach - Dillingen

    between t-junction Croisement CR364 / CR121 (Vugelsmillen) and roundabout Beaufort in both directions set of construction work, closed, duration: March 13, 2017 08:00 am until March 31, 2017 05:00 pm

  • Bridel, rue de Steinsel

    Kléngelbour in both directions set of construction work, closed, duration: March 13, 2017 08:00 am until March 31, 2017 05:00 pm

  • N31 France - Livange

    between junction A13 - Burange and t-junction Bettembourg Ouest in both directions set of construction work, set of temporary traffic lights, danger of stationary traffic, duration: March 06, 2017 09:00 am until December 22, 2017 05:00 pm

  • CR174 France - Route Nationale 3

    between roundabout Differdange and cross-roads Route Nationale 32 in both directions set of construction work, closed ahead, duration: March 10, 2017 08:00 am until November 10, 2017 08:00 pm

  • Echternach

    between Cité Mannertchen and Echternach in both directions set of construction work, set of temporary traffic lights, traffic problem, duration: March 01, 2017 until April 01, 2017

  • CR106 Lallange - Roodt-Lès-Ell

    between cross-roads Kleinbettingen Nord and cross-roads Steinfort - N6 / CR106 (R. de Kleinbettingen) in both directions set of construction work, closed ahead, traffic problem from March 06, 2017 07:30 am, follow signs

  • N2 Allemagne - Luxembourg

    cross-roads Luxembourg/Pulvermühle in both directions set of construction work, duration: March 06, 2017 until December 20, 2017

  • N10 Marbourg - Schengen

    between cross-roads Untereisenbach and t-junction Stolzembourg in both directions set of construction work, set of temporary traffic lights, traffic problem, duration: March 01, 2017 until March 31, 2017

  • N10 Schengen - Marbourg

    t-junction Ehnen in both directions set of construction work, set of temporary traffic lights, traffic problem, duration: February 20, 2017 until June 01, 2017

  • CR119 Route Nationale 11 - Schrondweiler

    between t-junction Koedange and cross-roads Ernzen in both directions set of construction work, set of temporary traffic lights, traffic problem, duration: March 01, 2017 until April 14, 2017

  • Bettembourg

    rue Michel Rodange in both directions set of construction work, closed ahead from February 27, 2017

  • Bridel

    rue Paul Binsfeld ; rue Bridelsknupp in both directions set of construction work, closed, traffic problem, duration: February 20, 2017 until April 01, 2017, follow signs

  • N12 Luxembourg - Belgique

    between cross-roads Emeschbaach and cross-roads Asselborn in both directions set of construction work, lane closed, traffic problem, duration: February 13, 2017 until July 27, 2017

  • CR152 Schengen - Mondorf-les-Bains

    between cross-roads Burmerange and roundabout Mondorf-les-Bains in both directions set of construction work, closed, duration: February 27, 2017 01:36 pm until April 21, 2017 08:00 pm

  • N2 Luxembourg - Allemagne

    cross-roads Moutfort in both directions set of construction work, set of temporary traffic lights, danger of stationary traffic, duration: January 23, 2017 until December 28, 2017

  • CR309 Eschweiler - Koetschette

    t-junction Brachtenbach in both directions set of construction work, closed, duration: March 26, 2017 08:00 am until 08:00 pm

  • CR132 Bettembourg - Moutfort

    between roundabout Syren and cross-roads Moutfort in both directions set of construction work, closed, duration: January 30, 2017 08:00 am until April 28, 2017 08:00 pm, follow diversion signs

  • CR106 Roodt-Lès-Ell to Lallange

    Kleinbettingen - Gare set of construction work, closed, duration: January 25, 2017 06:30 am until July 31, 2017 05:00 pm, follow diversion signs

  • CR157 Alzingen - Crauthem

    between cross-roads Alzingen - Route de Thionville (N3) and cross-roads Roeser in both directions set of construction work, closed, duration: January 23, 2017 08:00 am until March 23, 2017 05:00 pm

  • CR143 Canach - Route Nationale 1

    between t-junction Gostingen and cross-roads Chemin Repris 122 in both directions set of construction work, closed, duration: January 16, 2017 08:00 am until May 12, 2017 06:00 pm

  • N7 Belgique - Luxembourg

    between roundabout Walferdange and t-junction Béreldange in both directions set of roadworks, set of temporary traffic lights, danger of stationary traffic, duration: January 23, 2017 until March 31, 2017

  • N1 Luxembourg - Allemagne

    between cross-roads Luxembourg/Clausen and t-junction Neudorf - Rue de Neudorf / Rue du Kiem in both directions set of construction work, set of temporary traffic lights, traffic problem, duration: January 12, 2017 until July 28, 2017

  • N51 Autoroute de Trèves - Luxembourg - Avenue Marie-Thérèse

    between cross-roads Boulevard Konrad Adenauer and cross-roads Luxembourg - Square Schuman in both directions set of construction work, set of long-term roadworks, traffic problem

  • CR110 Esch-Sur-Alzette to Koerich

    between t-junction Bascharage - N5 / CR110 (R. de la Résistance) and t-junction Bascharage - Rue de Bascharage set of construction work, closed ahead, duration: October 17, 2016 08:00 am until July 31, 2017 06:00 pm

  • A13 Frontière Allemagne - Biff

    junction Hellange in both directions set of long-term roadworks, slip roads closed, duration: September 05, 2016 08:00 am until December 31, 2017 08:00 pm, follow diversion signs, recommended diversion via A3 Livange, A3 Dudelange, A13 Frisange and A13 Altwies

  • Bettembourg

    rue de la Gare set of construction work, lane closed, traffic problem, duration: August 22, 2016 until August 01, 2017 from town, follow diversion signs

  • N22 Belgique - Colmar-Berg

    between t-junction Roudbach - Croisement N22 / N22a and cross-roads Everlange in both directions set of construction work, set of temporary traffic lights until January 01, 2017, follow diversion signs

  • N10 Marbourg - Schengen

    between cross-roads Hèttermillen and t-junction Stadtbredimus in both directions set of construction work, set of temporary traffic lights, traffic problem, duration: June 27, 2016 until January 01, 2018, follow signs

  • A13 Frontière Allemagne to Biff

    junction Burange set of construction work, lane closed until November 30, 2017 08:00 pm

Previous Next

Mobility

Join us

Mobilité durable - La réforme fiscale

This content doesn't exist in English.

Clever fueren - Steiere spueren

Dans le cadre de la réforme fiscale l’introduction d’une série de mesures pour une mobilité durable :

  • un nouvel abattement pour les véhicules particuliers zéro émission ;
  • la réévaluation de l’avantage en nature forfaitaire pour les voitures de service en fonction de leur effet de pollution par rapport à leur contribution à l’effet de serre (émissions de CO2) et à la pollution de l’air (émissions de particules et de NOx).

Ces mesures, motivées par des objectifs liés tant à la santé publique et qu’à la protection de l’environnement, s’ajoutent aux efforts de promotion des transports publics et de la mobilité douce. C’est ainsi que deux tiers des investissements sont effectués en faveur des infrastructures de transport en commun, contre un tiers pour les infrastructures routières.

Contexte et objectifs

Le Gouvernement a une approche incitative plutôt que répressive :

  • Le Diesel n’est plus favorisé dans cette réforme fiscale;
  • Le véhicule 100% électrique, le cycle et le pedelec25 sont les grands gagnants.

Une déduction d’impôt ou une réévaluation de l’avantage en nature pour le conducteur éco-responsable sont mis en place.

Sur le site du gouvernement vous trouvez toutes les informations nécessaires.